Advanced Elevation Modeling, Topsoil Stripping Baseline & Proposed Pad Design
Step 1: Existing Ground Model
Upload site plan image, calibrate drawing scale, and log existing ground contours or point elevations.
Existing Points (0)
Name / ID
X, Y
Elev (ft)
Action
No existing points added. Click "+ Add Point" or load sample.
Step 2: Topsoil Stripping
Specify topsoil/muck strip depth. The system calculates removed volume and establishes the new baseline reference surface.
Sequential Rule: Stripped topsoil is placed in its own permanent volume bucket, and every existing point elevation is lowered by the strip depth to create the New Stripped Baseline.
Strip Calculation Complete
Site Footprint Area:0.00 sq ft
Topsoil Bucket Volume:0.00 CY
Step 3: Proposed Pad / New Grade
Input new concrete pad or structure design elevations. The system computes final cut and fill against the stripped baseline.
Proposed Pad Points (0)
Pad ID
X, Y
Proposed Elev
Action
No proposed pad points added yet.
Separated Volume BucketsReal-time ledger
Topsoil Stripped Bucket:
0.00 CY
Structural Cut (Subgrade):
0.00 CY
Embankment Fill (Pad):
0.00 CY
Net Import / Export:
0.00 CY
Status: Ready. Click 'Load Sample Data' to begin.|Active Scale: 1.00 ft / unit